Cathedral of the Immaculate Conception
Albany, New York
    New Stone Facing
North Tower Scaffolding    
Stone Anchor Testing
The existing vertically bedded brownstone on the cathedral had extensively delaminated and failed primarily from freeze-thaw cycles. The restoration included replacement of the brownstone for 60 percent of the building including the 190-foot-high north tower. RBA provided structural engineering services for the project including: in-situ testing of proposed stone anchors; analysis of the structure under construction loading; design of scaffolding support, and design of the north tower steeple reinforcing and hold-down, post-tensioned cables.


 